Resita Data Infrastructure SRL · Last updated: March 2026

Site Validation
Summary

Every claim made on this site — its current status, source type, and next required milestone. This page exists so you can evaluate credibility before investing time in a briefing.

Important: 650 MVA is installed transformer capacity, not consumer-available MW. 50–200 MW is a preliminary estimate only. Land is identified but not formally allocated. No construction permits have been issued.
Request Full Data Room (NDA) ← Back to Site

Status legend:

Confirmed — verifiable public record or documented evidence Preliminary / Subject to agreement Pending / Partner-dependent

01 — Power & Grid

650 MVA is installed transformer capacity. It does not mean 650 MW are available to a consumer. Actual connectable load requires a formal Transelectrica ATR study.

ClaimStatusSourceVerifiedNext milestone
650 MVA transformer capacity — Transelectrica 400/220/110 kV, ReșițaConfirmedEconomica.net — PublicNov 2024
Porțile de Fier–Reșița 400 kV line (117 km)ConfirmedThe Diplomat — PublicApr 2024
Reșița–Pančevo cross-border interconnector (131 km, 2×1,380 MVA)ConfirmedThe Diplomat — PublicJan 2025
4 EU PCI designations — ENTSO-E TYNDP Project 144ConfirmedENTSO-E — PublicMar 2026
PPC Romania 100 MW gas plant — 9.9 ha adjacent (Valle Terovei)ConfirmedProfit.ro — PublicDec 2025Construction TBD by PPC
Reșița–Timișoara 400 kV line (third corridor)Under constructionTranselectrica — RON 309.5M2025Completion ~2027–2028
Industrial electricity price ~€0.14/kWhConfirmedEurostat — Public2024
50–200 MW connectable capacityPreliminary estimateNot independently validated — indicative onlyFormal ATR study (6–12 months)
Formal Transelectrica ATR grid studyNot yet initiatedRequires development partner — ANRE Order 59/2013First action with development partner

02 — Land & Site

Land has been identified and is within the industrial zone. Formal allocation is a municipal decision that requires a development partner to proceed.

ClaimStatusSourceVerifiedNext milestone
~3 ha within Reșița industrial zone identifiedIdentifiedReșița industrial zone2026Formal allocation agreement
Industrial zoning — no rezoning requiredConfirmedReșița industrial zone — industrial classification2026
Formal land allocationSubject to agreementMunicipal decision — concession or purchaseMunicipal agreement with partner
Environmental pre-screening: no conflictsConfirmedSite analysis — details available under NDA2026Formal EIA with partner

03 — Permitting & Municipal

Formal municipal process initiated. No construction permits have been issued. All permitting milestones are operator-dependent.

ClaimStatusSourceVerifiedNext milestone
Municipal process formally initiatedIn progressReșița industrial zone — public tender procedure2026HCL vote — Local Council
Construction licenseNot yet initiatedStandard pathway — operator-dependent milestoneAfter land allocation and EIA
Environmental Impact Assessment (EIA)Required — not yet initiatedPre-screening clear; formal EIA pendingInitiation with partner
Construction permitsNot yet issuedOperator-dependent milestoneAfter EIA completion
Romania EU member state — GDPR, EU regulatory frameworkConfirmedEU — Public record

04 — Project Status

Transparent statement of what this project is and is not, as of March 2026.

This is not

  • A built or operational data center
  • A built or operational data center campus
  • A project with confirmed electrical capacity
  • A project with issued construction permits
  • A project with confirmed MW capacity (requires ATR study)
  • An offer to sell securities

This is

  • Strategic Partnership Agreement signed & registered — Municipality of Reșița
  • Documented grid adjacency (public infrastructure records)
  • Industrial land identified with zoning confirmed
  • Letter of Intent received from institutional fund — active investor discussions
  • Land acquisition capital being structured — post-tender purchase planned
  • Registered company — Resita Data Infrastructure SRL · CUI 54450187 · 7 April 2026
  • Listed on Baxtel (RES1) and DatacenterMap (RES1) — third-party industry directories

Ready to proceed to diligence?

Full data room includes: grid infrastructure analysis, site positioning brief, environmental pre-screening, zoning documentation, and partner framework. Available under NDA.

Request NDA Briefing View Partner Framework